Welcome to Iightstrade.com!

High Quality 24W LED Downlight

MOQ :50 piece

Lead Time :7 Days

Seller Support : Trade Authenticity Guaranteed & Accepting

Payment : L/C,T/T,Western Union, Money Gram, Credit Card, Paypal

Product details

Supply Ability

  • Supply Ability:1000000 piecesWarranty(Year):1 Year

Product Specifications

Product Description

Product Series Number:CL5013CW3014-24W(CW/PW/NW/WW)
 Power Consumption: 24W LED Downlight Luminance Flux: 1965 lm
 Size of Down Light: Dia 224x52.5mm Color-rendering Index: >85ra
 LED Type: SMD 3014 Power Dismiss: ≤10%
 LED Quantity: 120 pcs Power Factor: ≥95%
 Material: PC+Aluminum Environment temperature -20~50℃
 Input Voltage: AC85-265V/DC24V Warranty: 3 Years
 Colour Temperature: WW:2700-3200K Accessories: dia166±5mm
 NW:4000-4500K W.G./pc: 1.06kg/pcs
 PW:5000-5500K Pcs/ctn: 16pcs/ctn(47.2*38*47.5 cm)
 CW:6000-6500K Unit packing size: 23*23*9.5 cm

Product Description:

CNHidee LED can offer this LED Light in China. We are a professional LED light manufacturer. Here are the features and applications of this LED light.

Features:
1.High intensity, high resistance of shock or vibration
2.High efficiency up to 85%
3.Low illumination attenuation, 3% - 5% degradation/1kh
4.Long lifespan: 50,000hrs, 25 times more than normal energy-saving lamps.
5.Excellent heat dispersion, and low power consumption.
6.Easy installation, free maintanence.
7.High Power Factor: 0.95
8.No UV radiation
9.No mercury or other inorganics
10.Constant current to guarantee long life

Application:
1.Recess lighting, Shelf Lighting, Ceiling /Wall Coves
2.Cabinet and under counter lighting, Office work station
3.Back lighting, Step Lighting, Light boxes
4.Merchandising, Exhibition stands and panels

How to install LED lights?

Installation:
1. Turn off the power.
2. Drill a suitable mounting hole on ceiling according to size requirement of different item.
3. Connect input end of LED converter to power (110V-220V), and make sure connecting way is right.
4. Put LED driver at suitable place on ceiling.
5. Pinch both springs, then push light into installation hole . Make sure the light fixed well.
6. Re-check everything was connected well, then turn on the power.

You May Like